Biomass Veneer Dryer Runs on Biomass Burner
The quality of veneer production determines the quality of plywood. Therefore, the production of veneer in veneer dryer is often important in the production of plywood. In addition to the veneer rotary cutting, the veneer drying of the veneer is also a very critical link.
The Biomass veneer dryer is designed and developed by Shine Machinery. Unlike the steam boiler, thermal oil, gas boiler, hot air stove, waste wood fired furnace, the biomass burner can burn veneer waste, tree bark, other waste wood chips to heat air and supply the hot air to the dryer for drying the veneer. The total production cost is only USD 6-12 in drying one cubic meter veneer.
Biomass Veneer Dryer Runs on Biomass Burner Pictures
Technical Parameter for Biomass Veneer Dryer
Parameter Model |
DHS44M
| DHS48M | DHS52M | DHS56M | DHS60M |
Work width(m) | 3 | 3 | 3 | 3 | 3 |
Layer | 2 | 2 | 2 | 2 | 2 |
Veneer thickness(mm) | 0.5-5 | 0.5-5 | 0.5-5 | 0.5-5 | 0.5-5 |
Heating area (m)
| 40 | 44 | 44 | 48 | 52 |
Cooling area (m) | 4 | 4 | 4+4 | 4+4 | 4+4 |
Initial water content(%) | 50-80 | 50-80 | 50-80 | 50-80 | 50-80 |
Finished water content(%) | 10 | 10 | 10 | 10 | 10 |
Drying capacity (m³/h) | 2.7-3.1 | 3-3.3 | 3.2-3.5 | 3.5-3.8 | 3.8-4.1 |
Heat exhaustion(10000 kcal) | 94.5-108.5 | 105-115.5 | 112-122.5 | 122-132 | 132-143 |
Traction motor power(kw) | 5.5*2 | 7.5*2 | 7.5*2 | 7.5*2 | 7.5*2 |
Hot air fan power (kw) | 11*10 | 11*11 | 11*11 | 11*12 | 11*13 |
Air cooling fan power(kw) | 11 | 11 | 11*2 | 11*2 | 11*2 |
Total power (kw) | 132 | 147 | 158 | 169 | 180 |
Overall size LxWxH(m) | 44*4.5 | 48*4.5 | 52*4.5 | 56*4.5 | 60*4.5 |
Copyright By © Shandong Shine Machinery Co.,Ltd